1. Scope & Authorization
The Customer authorizes L&E Land & Forestry (“Contractor”) to perform only the work described in the agreed scope. Changes, additions, extra mobilization or materially different site conditions may require a written change order or additional authorization.
2. Property Access & Customer Authority
Customer represents that they own the property or have authority to authorize the work and will provide reasonable access for personnel, vehicles and equipment. Customer will identify known hazards, restricted areas, septic systems, wells, drainage features, easements and other site-specific concerns known to them.
3. Utilities, Wires & Underground Hazards
Customer is responsible for identifying and disclosing known private utilities and site hazards. Public utility locating/811 requirements will be followed as applicable. Unmarked or inaccurately marked private lines, communications lines, irrigation, invisible fences, septic components and similar hazards can create additional downtime, repair costs and schedule impacts. Contractor will not knowingly operate equipment where a known hazard makes the work unsafe.
4. Equipment Time & Billable Downtime
Unless specifically excluded in the pricing, scheduled equipment and crew time remains billable while the Contractor is on the project and reasonably attempting to perform the agreed work. This includes reasonable site-related downtime such as waiting for access or instructions, repositioning, clearing site debris, changing or blowing out air filters because of dusty conditions, cleaning equipment, routine field maintenance, wire/utility-related shutdowns, weather interruptions after mobilization, and other delays caused by the property or site conditions.
Downtime caused solely by Contractor equipment failure unrelated to the site, when the equipment is not being used, is not intended to be charged as productive equipment time unless otherwise agreed in writing.
5. Hidden Conditions & Obstructions
Buried debris, rock, concrete, stumps, roots, unstable ground, steep terrain, standing water, hidden utilities, undocumented structures or other conditions not reasonably visible during the initial assessment may require additional time, equipment or methods. Contractor will communicate material changes when practical before proceeding.
6. Weather & Ground Conditions
Rain, saturated soil, extreme heat, wind, lightning, snow or other conditions may require work to stop or change for safety and property protection. Weather-related delays may affect the schedule and, when the crew/equipment has already mobilized or remains assigned to the project, may result in billable time as specified in the pricing.
7. Trees & Material
Tree and brush removal is limited to the agreed scope and equipment capability. Contractor does not guarantee that every tree, stump, root, rock or invasive plant can be removed unless specifically included. Wood, chips, slash and other material will be handled as agreed; disposal, hauling or additional processing not included in the scope is extra.
8. Hunting Plot & Seeding
Hunting plot preparation may include clearing, shaping, access and seed-bed preparation as specifically listed. Seeding is not included unless expressly selected and priced as an additional service. If Contractor performs seeding, Customer understands that germination, plant establishment, yield and growth depend on weather, soil, seed, wildlife pressure, timing and other conditions outside Contractor control. No guarantee of growth or successful establishment is made.
9. Drone / Thermal Services
Optional Fox Two Aerial Solutions drone services may include aerial imagery, thermal observation, mapping or pre-season wildlife scouting. Flights are subject to weather, airspace, aircraft limitations and applicable laws and regulations. Thermal imagery can assist observation but does not guarantee detection, identification or recovery of wildlife and is not a substitute for a physical inspection.
10. Property Damage & Care
Contractor will use reasonable care in performing the agreed work. Customer understands that heavy equipment operates on natural ground and may leave tire tracks, rutting, disturbed soil, dust, noise or other ordinary evidence of construction/forestry activity. Contractor will not be responsible for conditions caused by undisclosed hazards, hidden utilities, pre-existing damage, ordinary site disturbance inherent to the agreed work, or conditions outside Contractor’s reasonable control, subject to applicable Virginia law.
11. Payment
Customer agrees to pay the amount and according to the terms shown above. Additional authorized work, change orders, additional mobilization, materials and billable site-related downtime will be added to the amount due. Past-due balances may be subject to lawful collection remedies and charges if stated in the final executed agreement.
12. Cancellation / Rescheduling
Because equipment and crew time are scheduled specifically for a property, cancellations or rescheduling after mobilization may result in a mobilization charge and/or scheduled minimum, as stated in the quote or final agreement.
13. Final Acceptance
Customer will have an opportunity to inspect the completed work. Minor variations caused by terrain, vegetation, weather, equipment limitations or safety considerations do not constitute failure to perform when the agreed scope has been substantially completed.